Tuesday, January 26, 2010

BOX CULVERT 6 26.1.2010

There is Non Comfirmence Report NCR about the reinforcement is dirty because of water that ponding on the reinforcement structure....

To closed the NCR I have prepared water tank and water pump for today...

water tank

water pump


On the same time I have supervise on steel work...

Arrange T25 and T20 at rebar Cut and Bend place...

rebar bend and cut place under Bridge 5...

Steel been cut 6m each...

The rebar been bend according to the dimension instructed...


Friday, January 22, 2010

BOX CULVERT 6 19.1.2010

Box Culvert 6 site


There are water trapped that made pond on the reinforcement structure.

The water can't flow because the sludge block the water access.